A normal day at work, cont.
The poop deck is being prepared for the 4 new generator sets which will be powering the 4 new thrusters. A new engine room is created, and the generators will be lifted on board when they arrive in Dubai.

The entire deck space is used for storage of staging equipment, air compressors, containers, steel profiles and all sorts of equipment used by the workers.
My TK branded bike with front basket.
The sides of the old bridge is cut and lowered down to the pier. Currently the new modules have been hoisted onto the vessel and are being fitted to the old bridge.
Welding of the new machine room.
1 Comments:
Hi
Nice blogg =)
Ha en fin dag!
Legg inn en kommentar